Skip to main content
Red paint texture for art installation service

Art Installation

Precise, conservation-minded installation for artworks, furniture, sculpture, and complex layouts.

Plan an Installation

Installation craft

Technical decisions should disappear into the finished room.

A successful installation feels inevitable, but it depends on careful review of the artwork, substrate, hardware, sightline, access, equipment, protection, and sequence.

Aiston supports residences, galleries, offices, institutions, fairs, estates, designers, advisors, and collection teams. Work may involve a single framed piece, a salon wall, sculpture, mirrors, dimensional work, complex layouts, rotations, or deinstallation.

Layered abstract artwork representing measured installation decisions
Placement is planned around the object and the site, not a standard hanging formula.

Installation Visualizer

See the installation before the crew arrives.

Add a room photo, enter the wall and artwork sizes, and explore placement before requesting an installation quote.

Room · Wall · Artworks · Quote Installation VisualizerPlan scale, spacing, and placement

Capability matrix

What the installation plan considers

Object

Medium and construction

Frame, glazing, weight, surface sensitivity, attachment points, balance, and condition.

Site

Wall and access

Substrate, utilities, stairs, elevators, loading, floor protection, ceiling height, and occupied spaces.

Placement

Sightline and sequence

Measurements, centerlines, spacing, layouts, designer direction, labels, and room order.

Equipment

Hardware and handling

Anchors, specialty hardware, lifts, scaffolding, rigging review, crew size, and site restrictions.

01020304

Project flow

From site review to final adjustment

  1. Review the artwork and room

    Photos, dimensions, wall conditions, desired placement, access, and timing establish the first plan.

  2. Confirm protection and hardware

    The crew, equipment, hardware, protection, delivery sequence, and any building requirements are coordinated.

  3. Place with measured alignment

    Artwork is unpacked, positioned, measured, installed, and adjusted with the client or project lead.

  4. Close the project

    Packing materials, placement records, deinstalled work, storage returns, or follow-up movement are handled as scoped.

Site preparation

Details that prevent surprises

What should be ready on site?

Confirm access, wall readiness, furniture movement, building permissions, loading instructions, electrical or plumbing uncertainty, and the person authorized to approve placement.

Can delivery and installation happen together?

Yes. Collection, transport, unpacking, placement, installation, debris removal, and onward storage can be coordinated in one scope.

Does Aiston specify structural engineering?

Where a project requires engineering, specialty fabrication, construction, or licensed trade work, those needs should be identified during review and coordinated separately as appropriate.

Start with the essentials

Tell us what is moving and what needs to happen next.

Aiston reviews the artwork, locations, access, schedule, and connected services before confirming scope. A quote request is not a booking or an automatic price.

Site, sightline, finish

Prepare an installation request

Share what you know now. Exact details can be confirmed with the project team.

  • Artwork photos, dimensions, medium, weight, frame, hardware, and any fragility notes
  • Wall, room, or site photos with placement goals and approximate measurements
  • Wall material, access conditions, floor protection, ceiling height, and equipment restrictions
  • Preferred date and whether delivery, unpacking, deinstallation, storage, or documentation is needed
Request a Quote Call Aiston